Update: 15 Mar @ 11:49am

Fixes (South London & Thameslink)
Missing Wires on tram section

Fixes (West South London & Thameslink)
Removed a bench at Swanley (clearly the most important fix here....)
Reverted to older version and re-added hove updates
Fixed issues with Missing Platform ends (reverted to old meh style - will re-add when updating clutter)
Fixed some Broken Track - unexpected (surprised no mentions before of this? )

Fixes (North London & Goblin to Brighton)
Fixed missing road at Richmond
Added hove + updates to more recent (different departure boards etc)

Update: 14 Mar @ 4:53pm

Updated

Not much - but Improved scenery around Hove (replaced most of the station clutter, and also improved vegetation / scenery around the station and towards Brighton

Update: 29 Sep, 2023 @ 8:38am

Updated

Fixed a few missing roads, odd missing terrain textures and also a bit of terrain covering St Pancras station, as well as a few overlapping roads on bridges (I had missed this due to not realising the chatham roads were wider) (on Goblin Section)

Update: 23 Jan, 2023 @ 9:27am

Updated (basically everything that's been added to South London & Thameslink.
I know that adding Chatham assets to the route will upset some, I can only apologise for that, but I'm only doing it to improve the route. (I'm aiming to remove the Asset Pack next, but have also lessened the use of WCML Trent Valley)
---------------------------

* Moved Signals / TSS Grids at Reigate (in the wrong place) (didn't actually update... )
Update for South London & Thameslink
* Added Beckenham Junction to Swanley & Orpington
* Added Level Crossing at Reigate (seemed an obvious one with adding Orpington)
* Replaced all Trent Valley Signal Gantries with Chatham ones
* Removed the Super Elevation at Crystal Palace (it keeps coming back)
* Fixed marker at Balcombe
* Added Quick Drive spawn points
* Removed requirement of Platform Clutter Pack (it's no longer needed)
* Possibly some other minor updates that were forgotten about.
* Scenery to City Thameslink complete (there were marker updates at Elephant & Castle - adjusting platforms)
* Roads / Lofts replaced with LondonGillingham folder (notes - I need to go over the platform lofts - and may replace some back to the older versions)
* I need to go over City Thameslink and Complete farringdon (and also Moorgate) but aside from that the core is more complete than ever)
* The version with North London / Goblin will be added later on (possibly next week)
* Extra Download and Station Pack no longer needed.
* (it does now need the new Chatham route for stations + buildings, it will work without but you'll be missing City Thameslink, Blackfriars and Elephant & Castle)
* The Core Thameslink section is essentially complete
* Farringdon Station is there but it's a bit meh! (I don't exactly have anything similar so it's very generic), I tried but not really much I can do without assets.
* Moorgate / Barbican / City Thameslink updated - but still generic.
* Also Fixed Scenery disappearing at Avenue Road Tram Stop
* Fixed some bench positioning between Brixton and Swanley
* Fixed Ravensbourne Thameslink Canopies (changed to SE - the route is set in 2012)
* Updated Platforms over the route to avoid clashing colours on the same stations
* Added Reigate Signal Box - special thanks to Benedict for this one (no extra download required)
* Fixed missing scenery (not sure if it applies to this route -

Update: 17 Jul, 2021 @ 3:22am

Update -
----------------------------------------------------------

* Improved Section between Merstham and Reigate (previously started - Mersham needs more work)
* Rebuild 90% of Trackside scenery between Redhill and Reigate (including moving bridges and updating Reigate station area)
* Other updates I've probably forgotten.
* Moved Signals / TSS Grids at Reigate (in the wrong place)

Update: 4 May, 2020 @ 4:17pm

----------------------------------
Patch Notes:
----------------------------------
• Added Missing Siding at Battersea Park (named 1a due to another marker named 1 - reason - limiting damage to scenarios)
• Removed all remaining flashing yellow signals south of London Bridge / Victoria (it's possible to have missed some by accident, there are a lot! )
• Adjusted a couple of minor signal issues (In posts/floating) - T100 in post at East Croydon
• Fixed Terrain Issue around New Cross / New Cross Gate (re-appeared for some reason)
• Added Missing Junction from Brighton Slow to P8-7 at Victoria (it connects to P5/6 - but no signal link - due to lack of asset).

Update: 18 Dec, 2019 @ 3:57am

* Fixed Redhill Signals (Northern End of Platforms - moved to fit almost for P2 - 12 Car Trains)
* Scenery updates around Redhill (at least some of it)
* Oxted and Caterham Trackwork / Signals (not from this update but a few months back)

Update: 27 May, 2019 @ 2:58pm

Updated V1.07

◦ Replaced almost all of the Kuju Signal Gantries South of Blackfriars (With exceptions)
◦ Updated some scenery at Barbican to Farringdon (station still to do)
◦ Updates to Reigate to Merstham area
◦ Probably a few things forgotten about.
◦ Fixed missing scenery at West London Start - Clapham Junction.

Update: 16 Feb, 2019 @ 3:02pm

Updated V1.06

* Fixed Missing Tunnel between Farringdon and Moorgate
* Added Missing Tunnel Occlusions between Kings Cross Thameslink and Moorgate
* Moved Signal WH1040 out of Tunnel Wall
* Fixed issue with missing St Pancras Thameslink station (although not sure if it was missing previously and it was just me)
* Missing Bridge near Crofton Park
* Extra Scenery between City Thameslink and Farringdon.
* Missing Crossover at Sanderstead
* Replaced route image so no longer the same as South London Network.
* Missing Terrain and Mixmaps between Selhurst and Clapham Junction
* A few other things I've forgotten

Update: 14 Oct, 2018 @ 10:46am

Update - (that may shock some)

  • All previous updates from South London & Thameslink
  • Added Goblin and West London Line to this route (the latter needs year 2012 route changes)