Train Simulator Classic 2024

Train Simulator Classic 2024

West Anglia Mainline V2
148 Comments
TristanGamer 10 Jan @ 12:57pm 
when will this be update to liv st via clapton & seven sisters?
brookh2019 31 Dec, 2024 @ 3:00pm 
any plans on connecting it to Liverpool Street and Cambridge????
dvdyussef2308 29 Dec, 2024 @ 7:59am 
do you have to download all the DLCs to download this?
ACTurbostar170 21 Dec, 2024 @ 10:08am 
Hi, wondering if anyone can help, I am in a similar position to scott567100 where I also have all of the requirements but missing OHLE and signals. I am new to TS so any help in the simplest form would be much appreciated! Thanks.
scott567100 20 Oct, 2024 @ 12:48pm 
Do you need both versions for the route to show full scenery? Feel like I'm missing a lot of assets despite having all of the requirements
BTYSONATOR 8 Jul, 2024 @ 7:38am 
Hi, what is the latest update on this? Many Thanks
l.mezza 14 May, 2024 @ 3:14am 
Any luck on the other extensions?
Robyn2827  [author] 13 May, 2024 @ 5:54am 
I'm going through some sh** right now. Sorry
Robyn2827  [author] 29 Apr, 2024 @ 2:02am 
Two new discussion threads have been posted for bug reports and route suggestions
Robyn2827  [author] 28 Apr, 2024 @ 11:39pm 
No, all DLC are being used in quite a lot of instances. For example there are signals from all 3 DLCs. There are also a lot of static scenery items from WHBR as well
413CT 28 Apr, 2024 @ 10:01pm 
can you remove the whbr dependency
Robyn2827  [author] 28 Apr, 2024 @ 3:39pm 
Discord privacy, sent a friend req
BritishAce1738 28 Apr, 2024 @ 3:34pm 
Ooo V2! I saw you sent a message through Discord, however unable to reply for some reason :)
Cyclone 28 Apr, 2024 @ 1:32pm 
At first glance at v2 of the route, I'm happy to see a nice and growing map. However, you are missing key portals. You need a portal after Nurthumberland Park as the track continues from there. When you later add on to there, you can leave that portal in for scenario compatibility (a mistake made on the DTG Morristown route removing a portal where the new line extended). There is also a portal needed after Turkey Street.

Coincidentally, there are portals that are unneeded and clutter up the map. Remove CHN Down portals and put one next to CHN Up. Move RYH up the branch a wee bit (beyond the platform) so we don't have "vanishing train syndrome" on the main line. Remove BXB, HWN, BIS. Remove SST Up portals and put a new one next to the Down portal. Rename Stage 8 Cambridge for later continuity. Merge other portals to be track neighbours. Portals must stay the same and easy to figure out between versions and are important to keep clear and uncluttered. :steamhappy:
Cyclone 28 Apr, 2024 @ 12:54pm 
@Candleton Inside the Route Properties file, you can find a list of referenced DLC. This includes what you see on the side (the asset pack, GEML, ECMLS, Woodhead Electric) but also reveals the AP Station pack is required (bundled with various routes) as well as the AP 315, DTG 455, and some superalbs things (likely for the quick drives). I do not know what "WAML" is by RLcraft. Maybe Robyn can elaborate.
Highball Simulation 28 Apr, 2024 @ 12:51pm 
So, what does this contain?
Cyclone 28 Apr, 2024 @ 12:49pm 
Going to download the update. Want to keep an eye on this. What are your future plans for the route? Are they intensive enough that we can finalize a v2 before moving on to add stuff in v3, thus allowing scenarios to be posted?
Candleton 28 Apr, 2024 @ 11:09am 
Hello, what are the full list of DLC requirements for this? I'm missing a lot of scenery, signals and OHL
Robyn2827  [author] 24 Apr, 2024 @ 11:15am 
This project still lives.
essexmancal 17 Aug, 2023 @ 11:12am 
Hi, i have an enquiry about this route. please accept my friend request.
dangerousdids2010 6 Aug, 2023 @ 12:29am 
has the phase 4 been added yet or is this dead route now
paddyb6 1 Aug, 2023 @ 12:50pm 
Just downloaded this - despite not being from the area, thoroughly impressed with your usage of assets to create station buildings and other buildings that are not modelled. Brilliant effort, look forward to any future updates.
Dark 4 May, 2023 @ 8:19am 
do you think you'd be working on liverpool street to chingford soon? that would be pretty amazing, a branch i've been looking to see for quite a while! other than that amazing work love it
l.mezza 14 Nov, 2022 @ 7:15am 
What happend to the other phases?
mehdi3x 23 Oct, 2022 @ 7:16am 
@DergenTheDragon Fair Enough, if this route was done in full and to a high standard id pay money for it tbh!
Robyn2827  [author] 14 Oct, 2022 @ 3:00am 
@EthanTGCentral it's up to you. This is not just personal bias speaking, this is as a consumer. The met line on JT does NOT come with the S8 stock, (it's AI only) you can buy the driveable S8 as a separate pack, I think it comes to £40.00? ish. It's your choice as to what you think is the best bang-for-your-buck.

What routes are you missing? They may not be necessary to 'run' the WAML route :D in which case you will not need to part with any money! :D
EthanTGCentral 13 Oct, 2022 @ 8:09am 
omg i just need 2 more routs then i can be happy with this but im alo getting the met line what should i get guys the routs for this route or the met line on just trains
dangerousdids2010 26 Jul, 2022 @ 12:05pm 
Excellent, Really wish this could do the part from stanstead airport up to liverpool street!
Robyn2827  [author] 19 Jul, 2022 @ 11:27pm 
@Dxnymo it's not 'dead' per se, more in a limbo. Looking for the motivation, and time, to work on it in any sort of meaningful capacity.
mehdi3x 18 Jul, 2022 @ 3:34am 
Did development for this die, or is it still in development?
BritishKid317 6 Mar, 2022 @ 9:51am 
any progress? desperate to have a version of the route complete in TS
JPT1987 6 Feb, 2022 @ 3:02am 
how is everything getting on any full compleated routes yet
Robyn2827  [author] 20 Dec, 2021 @ 4:06pm 
I have been incredibly busy with irl work lately, sadly I haven't been able to work on it.
AstroAreus 19 Dec, 2021 @ 1:54pm 
Hey Dergen, How are things going on as of right now? is there going to be any new update coming to the route
JPT1987 10 Dec, 2021 @ 9:46am 
How are things going with the route has any other stages been completed yet or getting there.
SillyWilly 28 Sep, 2021 @ 3:28pm 
Happy this route has been continued!! Looking foward to future updates. Keep up the progress :D
redbus35 23 Sep, 2021 @ 4:28am 
I have just found this route on workshop and it's amazing,i look forward to your update,s.
Thank you for this great work.
Robyn2827  [author] 17 Sep, 2021 @ 4:55am 
Work has resumed :O this project is not dead yet :P
Fenovax 18 Aug, 2021 @ 10:31am 
damn man ... when you get the time have another go.. i gotta do a full stansted express run
Robyn2827  [author] 17 Aug, 2021 @ 4:39am 
@hamster7233 progress is slow I'm afraid, bust with life rn and don't really have the time or energy to work on the project :c
Fenovax 17 Aug, 2021 @ 4:32am 
hey everyone.. hows the progress to the liverpool st bit coming ?
Robyn2827  [author] 14 Aug, 2021 @ 1:31pm 
@MrQuicko yes, it should work with no issues. Only some missing scenery assets
MrQuicko 14 Aug, 2021 @ 3:00am 
will it work if i have everything apart from woodhead line?
Robyn2827  [author] 18 Jun, 2021 @ 6:12am 
The different track 'types' are just to get the right radius of curvature for the line section. It shouldn't matter otherwise? @BartTheBrit But thanks :3 It's been a labour of love for years
transportfoxie 18 Jun, 2021 @ 3:09am 
This line is amazing! It feels the same as I remember it, and the only problem I have had is that line types are a mess. There's a massive chunk of freight track between Roydon and Harlow Town plus more areas, which meant I had to manually select the track and set it to Main Line so the priorities work. Other than that, you've done an amazing job at recreating the WAML
Jeagles 11 Jun, 2021 @ 1:30pm 
ah, right. Thanks
Robyn2827  [author] 11 Jun, 2021 @ 12:45pm 
@Jeagles the route has track to Tottenham Hale,but you can only drive to Cheshunt, and along the entire Hertford East branch but with no scenery past St. Margarets
Jeagles 11 Jun, 2021 @ 12:07pm 
How far South does this route go at the moment?
Robyn2827  [author] 1 May, 2021 @ 6:08am 
@JPT1987 There has! Lot's of progress has been made to minimise the requirements for the route, some new asset packs have been added while others have been removed entirely.
A list of stuff currently being done:
Replacement of all the OLE and catenary to something better (though 3rd party)
Replacement of all signals to JTMS along with a total scenery rework and line side signage rework.
Several minor signalling updates after feedback
The removal of Thompson (now Rivet) assets is ongoing and progressing nicely.
It is important to note there are no new track extensions, only existing track and scenery will be updated for the next version.

Exciting times ahead!
JPT1987 30 Apr, 2021 @ 4:57am 
How is everything going has there been any new progress so far.